Concrete Cover

The cover table, then the three numbers it feeds: chair height, tier gap and bars per layer

← Back to the calculator
Concrete cover is 3 in cast against earth, 2 in for #6 and larger exposed to weather, 1½ in for #5 and smaller, and ¾ in inside a protected slab. Those four numbers are the whole of ACI 318-19 Table 20.5.1.3.1 for ordinary building work.
3 incast against earth
2 inexposed, #6 and up
1½ inexposed, #5 and down
¾ inprotected slab, #11 and down

Cover is not a finish tolerance. It is the dimension that decides how long the bar takes to corrode, and it is also the first term in three other numbers: the chair height that holds it, the clear gap between two mats, and the effective depth the section is designed on.

That is what the rest of this page does. Table first, then the chain from cover to chair height to tier gap to how many bars fit in a layer, because a cover that is right on paper and wrong in the chair is the same as no cover at all.

01 The cover table, cast in place

ACI 318-19 Table 20.5.1.3.1, specified cover for cast-in-place nonprestressed concrete. Read it by exposure first, then by member, then by bar.

ACI 318-19 Table 20.5.1.3.1 (cast-in-place) · 20.5.1.3 (precast) · 20.5.1.3.5 (bundled bars) · 25.2.1 (clear spacing) · 25.2.2 (1 in between layers) · ACI 117 (placement tolerance)

ExposureMemberBarCover (in)
Cast against and permanently in contact with groundAllAll3
Exposed to earth or weatherAll#6 to #182
#5 and smaller1½
Not exposed to weather, not in contact with groundSlabs, joists, walls#14, #181½
#11 and smaller¾
Beams, columnsPrimary, ties, stirrups, spirals1½
Shells, folded plates#6 and larger¾
#5 and smaller½
Swipe the table sideways to see every column.
Source. ACI 318-19 Table 20.5.1.3.1, reproduced in CRSI's Manual of Standard Practice. Cover is measured to the outside of the outermost bar, which in a beam or column means the stirrup, not the main bar. Placement tolerance on top of the specified value is ACI 117: ±¼ in for members under 12 in deep.

The blue row is the one that gets missed. A footing poured directly against soil needs 3 in of cover on the sides and bottom, and most residential footing details are drawn with 2 or 3 in of bottom cover and nothing said about the sides. That is a code requirement, not a preference, and it is the reason a footing has to be 2 in wider than the cage plus the bar if the form is the soil itself.

02 Precast and bundled bars

Plant-controlled precast gets its own table, and the numbers are lower because the cover is not fighting a field-formed surface. ACI 318-19 20.5.1.3, second table.

ExposureMemberBarCover (in)
Exposed to earth or weatherWall panels#14, #181½
#11 and smaller¾
Other members#14, #182
#6 to #111½
#5 and smaller1¼
Not exposed, not in contact with groundSlabs, walls, joists#14, #181¼
#11 and smaller¾
Beams, columnsPrimary reinforcementdb, min ½ max 1½
Ties, stirrups, spirals⅜
Swipe the table sideways to see every column.

Bundled bars. Cover is the equivalent diameter of the bundle, need not exceed 2 in, and stays at 3 in where the concrete is cast against and permanently in contact with the ground. ACI 318-19 20.5.1.3.5. Three #5 bars bundled have an equivalent diameter of about 1.25 in, so the cover is 1.25 in and not the 1.5 in the table would give for a single #5.

03 The chain: cover to bars per layer

Six steps. Every one of them is a number somebody on site has to set, and the last one is the only one that changes the design.

SymbolMeaningUnitWhere it comes from
cSpecified coverinTable 20.5.1.3.1
dbBar diameterinASTM A615
hChair heightinStep 2
tMember depthinDrawing
gClear gap between matsinStep 3
sMinimum clear spacinginACI 318-19 25.2.1
bMember widthinDrawing
NBars per layercountStep 5
Swipe the table sideways to see every column.

1. c = table value for exposure, member and bar 2. h = c + db ÷ 2 (height to the bar centreline) 3. g = t − c_b − c_t − db_b − db_t 4. s = max(db, 1 in, 4/3 × dagg) 5. N = (b − 2c + s) ÷ (db + s), rounded down 6. As = N × Ab

Step 2 is where the chain usually breaks. Step 3 is where a slab that is 1 in too thin quietly loses a mat. Step 5 is where the cover you chose costs you a bar: an extra half inch of cover on a 12 in wide member is half an inch less clear width, and at 1.33 in spacing that can be a whole bar.

04 Chair height, and the two conventions

Chairs are sold by height, and two conventions are in circulation: height to the underside of the bar, and height to the centreline. They differ by exactly db ÷ 2, which is 0.25 in on a #4 and 0.5 in on a #8. Order the wrong one and you are a quarter inch short of cover across the whole slab.

BarCover (in)Height to undersideHeight to centreline
#41.51.501.75
#42.02.002.25
#51.51.501.81
#52.02.002.31
#61.51.501.88
#62.02.002.38
#81.51.502.00
#82.02.002.50
Both conventions, in inches. Check which one your chair catalog quotes.
Four bars at 1.50 in cover drawn to one scale: the underside sits on the same line, the centreline drops by db/2, from 0.25 in on a #4 to 0.50 in on a #8 One cover, four bars, four centreline heights All four sit at 1.50 in cover. The chair height is the same number; the centreline is not. concrete surface 1.50 in — underside of every bar, so this is the chair height #4#5 #6#8 db/2 = 0.250.31 0.380.50 red dot = centreline, and it is what a centreline-height chair is set to
The gap between the two conventions is exactly db/2: 0.25 in on a #4, 0.31 on a #5, 0.38 on a #6 and 0.50 on a #8, all at the same 1.50 in cover. Order the wrong convention and the shortfall grows with bar size.

The convention that sets cover is the first one: the underside of the bar sits at the chair height, so the chair height is the cover. The centreline convention is what you use when you are checking effective depth, because d = t − c − db ÷ 2 for the bottom mat. If a supplier's catalog does not say which, measure one chair.

05 The gap between two mats

The clear gap is what is left of the depth after both covers and both bar diameters, and ACI 318-19 25.2.2 puts a floor of 1 in on it.

Slab depthClear gap between matsTwo #4 mats?
4 in0.0 inNo — below the 1 in minimum
5 in1.0 inExactly the 1 in minimum
6 in2.0 inYes
8 in4.0 inYes
10 in6.0 inYes
12 in8.0 inYes
1.5 in cover each way, #4 top and bottom, gap = t − 2c − 2db.

The 4 in row is the useful one. A 4 in slab with 1.5 in cover and #4 both ways has no clear gap: 4 − 1.5 − 1.5 − 0.5 − 0.5 = 0. Nothing about that detail is ambiguous, and no amount of chair ordering fixes it. The minimum depth for two #4 mats at 1.5 in cover is 2 × 1.5 + 0.5 + 0.5 + 1 = 5 in.

06 Put your own numbers in

Cover per ACI 318-19 Table 20.5.1.3.1. Minimum tier gap 1 in per 25.2.2. Clear spacing per 25.2.1. Bars per layer counts one row of the bottom mat.

What this page does not do

Common questions

What is the minimum concrete cover for rebar?

It depends on exposure and bar size, and there is no single number. Direct cast against earth is 3 in. Exposed to earth or weather is 2 in for #6 and larger and 1½ in for #5 and smaller. Not exposed, in a slab or wall, is ¾ in for #11 and smaller. All of these are ACI 318-19 Table 20.5.1.3.1, and the 3 in row is the one that surprises people: a footing poured against soil has to hold 3 in, not 2.

Is 2 inches of cover enough for rebar?

Enough for a #6 or larger bar exposed to weather, and enough for any bar cast against earth only if you are not in contact with the ground. Two inches fails the 3 in requirement for anything cast directly against soil, which is the single most common cover error on a footing. Two inches also fails the ¾ in interior slab requirement only in the other direction: it is more than needed, and that costs you effective depth.

How is cover measured, to the bar or to the stirrup?

To the outermost steel, which in a beam or column is the stirrup. A beam with a #3 stirrup and 1½ in of cover has the main bar centre at 1½ + ⅜ + half the main bar, so 2.19 in for a #5 main bar. Measuring cover to the main bar and getting 1½ in means the stirrup is outside the concrete, which is the failure mode that shows up as rust spots along a beam line.

What height of chair gives 1.5 inches of cover?

It depends on which convention your supplier quotes. Height to the underside of the bar is 1.5 in, and that is what sets cover. Height to the bar centreline is 1.5 + db/2, so 1.75 in for #4 and 1.81 in for #5. Chairs are stocked in 1 in steps, so both land on a 2 in chair, but a 1 in chair would leave 0.75 in of cover on a #4 and fail.

How much gap do I need between the top and bottom mats?

At least 1 in of clear space, ACI 318-19 25.2.2. The gap you actually get is t − c_bottom − c_top − db_bottom − db_top. On a 6 in slab with 1.5 in cover and #4 both ways that is 6 − 1.5 − 1.5 − 0.5 − 0.5 = 2.0 in. On a 4 in slab the same arithmetic gives zero, which is the check telling you the slab is too thin for two mats, not that the gap is small.

Does cover change with bar size?

Yes, but only across one boundary. Below #6 the exposed-to-weather cover is 1½ in and at #6 and above it is 2 in, so going from #5 to #6 adds half an inch of cover and takes it straight out of the effective depth. Interior slabs split at #14, which almost never appears in building work. The step is per bar, not per member.

What is the cover on bundled bars?

The equivalent diameter of the bundle, but never more than 2 in, and never less than 3 in where the concrete is cast against and permanently in contact with the ground. A bundle of three #5 bars has an equivalent diameter of about 1.25 in, so 1.25 in of cover, not 1.5. ACI 318-19 20.5.1.3.5.