Epoxy for Rebar Dowels

Two products share the word — one is the connection, the other is a coating that costs you embedment

← Back to the calculator
“Epoxy” in a dowel spec is one of two products, and they are not interchangeable: an injected adhesive that is the structural connection, or an epoxy-coated bar that is a corrosion barrier and makes bond worse.
2products, one word
1.82 in³adhesive, #4 hole
9holes per 10 oz
+50%embedment, coated

The adhesive is the one you want when the bar goes into cured concrete. A #4 bar takes a 5/8 in hole, 16.5 in deep, 1.82 in³ of adhesive per hole, and a 10 oz cartridge fills nine of them.

The coated bar is a different purchase altogether: a factory coating to ASTM A775 on bar that goes into chloride exposure. It is not a glue and it does not improve grip — the coating factor raises development length by 20% or 50% depending on cover and spacing, so a #4 dowel's embedment goes from 16 in to 20 in or 24 in. The rest of this page keeps the two apart, because a quote, a drawing and a search box all use the same word for both.

Two products, one word

A cartridge of anchoring adhesive and a bundle of green bar are sold by different people, specified in different sections and tested to different standards. They share a word and nothing else. Reading the two columns side by side is the fastest way to see which one a project actually needs.

Injected adhesiveEpoxy-coated bar
What it isTwo-part epoxy or hybrid mortar in a cartridge, mixed in a nozzle and injected into a drilled holeDeformed or plain bar with a shop-applied epoxy film, electrostatic spray, to ASTM A775
What it doesBonds the bar to the hole wall and transfers load in shear over the embedmentKeeps chloride and moisture off the steel surface
Where it belongsSetting a bar into cured concrete — a dowel into a wall, a footing, an existing slab edgeBridge decks, marine and parking structures, de-icing salt exposure — anywhere the bar is at risk of corrosion
Effect on the arithmeticSets the hole diameter, the drilled depth and the cartridge countRaises development length by 20% or 50%, so it changes the embedment the drawing has to show
Governing documentICC-ES evaluation report for that adhesive, under AC308; design to ACI 318-19 Chapter 17ASTM A775 for shop-applied coating, ASTM A934 for prefabricated; bond factor in ACI 318-19 Table 25.4.2.5
What it does not doDoes not protect the bar outside the holeDoes not glue anything, and does not improve bond — it costs bond

Swipe the table sideways for more columns →

The one-line test: if the product comes with a cartridge and a mixing nozzle it is an adhesive; if it comes with a mill certificate and a coating thickness it is a coated bar. A supplier who answers “epoxy” without saying which is answering a different question.

The adhesive side: what the glue is actually doing

The load path is short and it does not start at the glue. Bar, then adhesive, then hole wall, then concrete. The adhesive's only job is to fill the annulus completely and stay there; the surface that carries the load is the bonded area of the bar, and that is a plain cylinder:

bonded areaπ × db × embedment
#4 exampleπ × 0.500 × 16 = 25.1 in² of bonded surface per dowel

That number is why the glue brand is the last variable, not the first. Doubling the embedment doubles the bonded area; changing the cartridge changes the mixing ratio and the cure time, not the area. It is also why a dusty hole fails: the load has to cross the wall, and dust is a layer between the adhesive and the wall.

Bardb (in)Bonded area per inch of embedment (in²)Embedment (in)Bonded area per dowel (in²)
#30.3751.181214.1
#40.5001.571625.1
#50.6251.961937.3
#60.7502.362354.2
#70.8752.753493.5
#81.0003.1438119.4

Swipe the table sideways for more columns →

Embedment is the simplified development length for Grade 60 bar in 4,000 psi concrete — the same figures used across this site, tabulated on the development length page. A #8 dowel needs 8.5× the bonded area of a #3 for the same steel stress, and the annulus around it grows with it.

Scale that to a joint and the cartridge count falls into place. A 20 ft joint at 16 in on centre is floor(240 ÷ 16) + 1 = 16 dowels:

dowels16 × #4, 5/8 in bit, 16.5 in drilled
adhesive16 × 1.82 = 29.2 in³
cartridges29.2 ÷ 18.05 = 1.6 → two 10 oz, or one 600 ml
bar length16 × (16 in embedment + projection) — projection per drawing

The hole table, the bit sizes and the cleaning sequence are already worked out per bar size on the rebar dowel page, and this page does not repeat them. What matters here is the arithmetic that separates the two products: adhesive volume is a property of the hole, and it does not change if the bar is coated. A coated #4 in a 5/8 in hole still takes 1.82 in³.

The coating side: 20% or 50% in inches

ACI 318-19 gives epoxy-coated bar a coating factor that multiplies development length. It is 1.2 when cover is at least 3db and clear spacing at least 6db, and 1.5 in the tighter case — which, in a dowel row at 12 to 16 in on centre with 2 in of cover, is the case you are usually in. Coating is a corrosion decision, and this is its structural price.

BarUncoated ld (in)Coated, ψe 1.2 (in)ExtraCoated, ψe 1.5 (in)Extra
#31215+318+6
#41620+424+8
#51923+429+10
#62328+535+12
#73441+751+17
#83846+857+19

Swipe the table sideways for more columns →

Grade 60, 4,000 psi concrete, ψt = ψs = 1.0. Coated values are the uncoated ld × ψe, rounded up to the next inch, as a drawing would round them.

The same #4 dowel, uncoated and epoxy-coated, drawn to one scale: 16 in of embedment against 24 in Uncoated #4 Epoxy-coated #4, ψe = 1.5 16 in 24 in +8 in One scale, 8 px per inch. Same bar, same concrete, same load — only the coating differs.
Coating is drawn to scale: the same #4 dowel needs 8 in more embedment at ψe = 1.5. On a 20 ft joint at 16 in on centre that is 128 extra inches of bar, or 7.1 lb of steel.

Eight inches per bar sounds like nothing until it is multiplied. The same 20 ft joint, 16 dowels, both coating cases:

ψe 1.216 × 4 in = 64 in = 5.33 ft × 0.668 lb/ft = 3.56 lb
ψe 1.516 × 8 in = 128 in = 10.67 ft × 0.668 lb/ft = 7.13 lb
at $0.898/lb$3.20 or $6.40 of extra steel per joint, before the coating premium

Self-check: 128 ÷ 12 = 10.67 ft, and 10.67 × 0.668 = 7.13 lb. The $0.898/lb figure is the retail rate worked out on the price per foot page; it is a published market figure, not a quote.

There is a second cost that is easier to miss: the extra embedment has to fit. A 20 ft joint detail that was drawn with 16 in of embedment and 12 in of projection becomes a 36 in bar, and a bar that long may no longer come out of the offcut pile — it comes off a new stick. That is an order-quantity change, not a detail change.

Why a coated dowel exists at all

The obvious objection is that a joint dowel is not bonded on both sides anyway. A round dowel is sleeved on one half so that half can slide; a plate dowel sits in a pocket former. So where does coating earn its place?

At the joint face. A dowel crosses a joint, which means there is a plane through the slab where the bar is interrupted by a gap, and that gap is the one place chloride, de-icing salt and water reach the steel directly. Corrosion in a dowel does not usually start in the middle of the embedment, where 2 in of concrete covers it; it starts at the joint, where the bar is exposed for the width of the opening. That is what the coating is for, and it is why coated dowels show up on bridge decks and parking structures and almost never on an interior slab on grade.

Which gives the rule this page exists for: the adhesive and the coating solve different problems in the same hole, and neither substitutes for the other. Adhesive bonds the anchored half; the coating protects the exposed face. A coated bar in a drilled hole still needs adhesive, and adhesive in the hole does nothing for the 3/4 in of bar standing in the joint gap.

Cutting, bending and patching

Coating is a shop process. The bar is blast cleaned, heated, sprayed electrostatically and cured before it leaves the plant, and everything that happens to it afterwards is a chance to lose the film:

Not verified here: the coating thickness a project should specify, in mils, is a number this page does not quote. It is on the mill certificate and in the project specification, and it varies with the coating class the spec calls for. A thickness copied from a supplier blog is not a specification.

The number neither product gives you

Everything on this page is arithmetic: annulus, volume, cartridge count, embedment. None of it is a capacity, and the step where most dowel jobs go wrong is treating a cartridge label as one.

An adhesive anchor's capacity comes from an ICC-ES evaluation report issued for that specific adhesive, under acceptance criteria AC308, and the report tabulates capacity for specific bar sizes, hole diameters, embedments and concrete strengths. ACI 318-19 Chapter 17 governs how those tabulated values are used in design. Three things follow, and they are checkable without doing any engineering:

  1. The report has to exist for the adhesive on site, and it has to be current.
  2. The bar size and embedment have to be in its table. A 16 in embedment for a #4 that is not in the table is not covered by the report, whatever the arithmetic says.
  3. The hole has to be the diameter the report specifies. If the report says 5/8 in, a 3/4 in hole drilled because the 5/8 bit was blunt is a different, unlisted detail.

For a coated bar the equivalent is simpler: the coating changes bond, the bond factor is in the code, and the structural design that produced the embedment already accounts for it — or it does not, and the drawing is short. Either way the number to check is the embedment on the drawing against the table above, not the coating's corrosion performance.

Which one do I need?

Decision path: is the bar going into cured concrete, and is the exposure chloride Bar going into cured concrete? a dowel into a wall, footing or slab edge YES NO Injected adhesive hole = bar + 1/8 in, depth = ld + 1/2 in Chloride exposure? deck, marine, de-icing salt YES NO Epoxy-coated bar budget ld × 1.2 or 1.5, patch all damage Black bar uncoated, ld as drawn A joint dowel that has to slide is a third case: smooth bar plus sleeve, or a plate in a pocket former — see /concrete-dowels and /diamond-dowels
Three outcomes, and the second question is about exposure rather than strength. Coating is bought for the environment the bar sits in, not for the load it carries.

Four questions, in this order, settle it:

  1. Is the bar being set into concrete that is already hard? Then the connection is adhesive, and the rest of the page is about hole geometry.
  2. Is the bar in chloride exposure? Then coating is on the table — and the embedment on the drawing has to be 20% or 50% longer than the uncoated figure.
  3. Does the joint have to slide? Then the bar is smooth and sleeved, or a plate in a pocket former. Coating is a corrosion call at the joint face; it is not what makes the joint move.
  4. What does the quote actually list? A cartridge part number is an adhesive. A mill certificate and a coating thickness is a coated bar. A quote that says only “epoxy dowels” is missing the one word that decides the job.

Sizing, sleeve counts and joint arithmetic live on the concrete dowels page; the drilled-hole table and the cleaning sequence are on the rebar dowel page; how many dowels a joint takes at 12 in on centre is on the dowel count page.

Watch: two products, one word, in one screen

16-second walkthrough: the adhesive side is hole geometry (#4: 5/8 in bit, 16.5 in deep, 1.82 in³ per hole, nine holes per 10 oz cartridge); the coating side is the embedment penalty (16 in becomes 20 in or 24 in, +7.1 lb of steel on a 20 ft joint). From the rebarcount channel.

Common questions

Does epoxy coating make a dowel bond better?

No, it makes bond worse. ACI 318-19 gives coated bar a coating factor of 1.2 or 1.5 that multiplies development length, so the same bar needs 20% or 50% more embedment. The coating is there to keep chloride off the steel; it is not a bonding agent, and the smooth, inert film is exactly why the code penalises it.

Can I use epoxy-coated rebar as a dowel?

Yes, and on a bridge deck or a parking structure it is often required — but two things change. The embedment grows by the coating factor, so a #4 goes from 16 in to 19 in or 23 in, and every cut end and field bend has to be patched before the pour. If the dowel also has to slide, the sliding half still needs a sleeve or a pocket; coating does not provide the slip.

How much epoxy do I need per dowel?

It is the annulus between the hole wall and the bar, times the drilled depth. For a #4 bar in a 5/8 in hole drilled 16.5 in deep that is 1.82 in³; #3 is 1.07, #5 is 2.63, #6 is 3.75, #7 is 6.35 and #8 is 8.03. Add about 10% for what stays in the nozzle and on the floor.

How many dowels will a 10 oz cartridge fill?

A 10 oz cartridge is 18.05 in³. At 1.82 in³ per hole that is nine #4 dowels; #3 gives about 16, #5 about 6, #6 about 4, #7 about 2 and #8 about 2. The count falls fast with bar size because the annulus grows while the cartridge does not.

Do I need epoxy for a dowel into existing concrete?

If the detail is an adhesive anchor, yes — that is the connection. The alternative is a mechanical anchor, which is a different product with its own evaluation report and its own hole tolerance. What you cannot do is substitute construction adhesive from a hardware store: it has no evaluation report for cracked concrete, no tabulated embedment and no design basis.

Is construction adhesive the same as anchoring epoxy?

No. Anchoring adhesive is a structural product with an ICC-ES report under AC308 and tabulated capacities for specific bar sizes, hole diameters and embedments. Construction adhesive is a gap filler for trim and subfloor. They look similar in a cartridge and share nothing else — the failure mode of the wrong one is a dowel that pulls out quietly.

What happens if the hole is dusty?

The bond is between the adhesive and the hole wall, so dust is a layer in the load path. The sequence that works is brush, blow, brush, blow — two full cycles — and then look into the hole. A hole that is 16.5 in deep holding an inch of dust is a 15.5 in hole, which is 6% less bonded area and nothing about it looks wrong from the surface.

Can I bend an epoxy-coated bar on site?

Only where the specification allows it, and the coating on the outside of the bend will crack. Shop bending before coating is the normal route; field bends are a patching job, and the patch material has to be the one supplied for that coating system. A bend that was not patched is bare steel at the point of highest strain.