Rebar Dowel

What size dowel, how deep it goes in, how much sticks out, and how many per foot

← Back to the calculator
A rebar dowel is a short bar cast into one pour and left standing for the next.

The buried end must be at least the development length — 16 in for #4 Grade 60 in 4,000 psi concrete — and the exposed end laps the next pour’s bars: 21 in for a Class B lap. That is a 37 in cut, and six of them from a 20 ft stick.

A dowel is not a lap splice and not an anchor. A lap joins two bars end to end so the pair carries tension through one pour; an anchor develops a bar into concrete to hold a load. A dowel does both jobs across a construction joint — the buried end develops in the first pour, the exposed end laps into the second — and if either end is short, the joint becomes the plane the load was supposed to cross.

The embedment figures here come from the same ACI 318-19 §25.4.2.2 simplified table the development length page carries: Grade 60 bar, 4,000 psi normalweight concrete, no epoxy. Change the strength, the grade or the coating and the embedment moves; the method does not.

16 inembedment, #4
21 inClass B projection
37 incut length
6per 20 ft stick

What a rebar dowel is — and what it is not

A dowel is a short length of bar embedded in one pour and left projecting into the next. It does three jobs at once: it transfers load across the construction joint, it locates the second pour, and it ties the two pours into one structural element. You meet them wherever a wall meets a footing, a slab meets a wall, or two pavement sections meet.

Two things it is not:

That distinction is where dowel details go wrong: the buried end gets sized like an anchor (too short), or the exposed end gets sized by eye (too short to lap). Each end has its own rule, and the cut length is the sum.

Embedment is the development length

The buried end has to develop the bar’s yield force in the first pour. That is exactly what development length measures, so the embedment is the development length — not a round number and not “half the wall thickness.” ACI 318-19 §25.4.2.2 gives the simplified value for a straight deformed bar in tension, and §25.4.2.1 sets a floor of 12 in for any bar.

Bardb (in)ld (in)ldld (mm)
#30.37512*1 ft 0 in305
#40.500161 ft 4 in406
#50.625191 ft 7 in483
#60.750231 ft 11 in584
#70.875342 ft 10 in864
#81.000383 ft 2 in965
#91.128433 ft 7 in1,092
#101.270494 ft 1 in1,245
#111.410544 ft 6 in1,372

Swipe the table sideways for more columns →

* #3 falls below the 12 in minimum, so 12 in governs. Grade 60, 4,000 psi normalweight, uncoated, standard cover.

What the cover does not do is change these numbers. The expression behind them takes fy, f'c, the bar diameter and four factors, and cover is not one of them, so a #8 needs 38 in whether the chair is 1.5 in or 3 in. Cover decides whether the bar is in the right place, not how long the embedment is. The development length page works the arithmetic symbol by symbol — it is the same arithmetic that decides a dowel’s embedment.

The projection is a lap, not a guess

The exposed end laps the bars of the next pour. So its length is a lap length: 1.0 × ld for a Class A splice, 1.3 × ld for Class B. Class B is the default whenever nobody has verified that the steel is at least twice what analysis requires and that no more than half the bars are spliced at one section — which, in practice, is most of the time.

Barld (in)Class A lapClass B lap (default)
#31212 in16 in
#41616 in21 in
#51919 in25 in
#62323 in30 in
#83838 in50 in

Swipe the table sideways for more columns →

This is where the “6 in of dowel” detail comes from and why it fails: 6 in is neither a #4 embedment (16 in) nor a #4 lap (21 in). If the drawing genuinely calls a short projection, it is not a lap — it is a different connection, and the wall’s bars must be anchored some other way. The drawing wins, but it is worth knowing which of the two you are building.

A number four rebar dowel: 16 inches of embedment in the footing plus 21 inches of projection to lap the wall bars, a 37 inch cut length One dowel, three lengths: embedment, projection, cut #4 Grade 60 · 4,000 psi concrete · Class B lap projection FOOTING POUR WALL POUR pour line 16 in embedment = ld for #4 at 4,000 psi 21 in projection = Class B lap, 1.3 × ld 37 in cut length Cut length = embedment + projection. A 20 ft stick yields 6 of these, with 18 in left over. The projection is a lap, not a guess: it must overlap the wall bars by a Class B lap length.
The three lengths of one dowel. Embedment develops the bar in the first pour; the projection laps it into the second; the cut length is the sum.

How many dowels along the joint

Count a dowel line the way you count a mat: floor(clear length ÷ spacing) + 1. The +1 is the dowel at the far end, and it is the one people forget — a 20 ft wall at 16 in on centre is 16 dowels, not 15, because 240 ÷ 16 = 15 spaces and 16 bars close them.

SpacingDowels per footDowels in a 20 ft wall
12 in o.c.1.0021
16 in o.c.0.7516
18 in o.c.0.6714
24 in o.c.0.5011

Swipe the table sideways for more columns →

The spacing is the drawing’s call, but the count rule is the same at any spacing — and it is the same rule the spacing calculator uses for a mat, which is why a dowel takeoff and a mat takeoff never disagree when they are done the same way.

Cut length and what a stick yields

Cut length = embedment + projection. For the #4 example that is 16 + 21 = 37 in. Then a 20 ft stick (240 in) yields floor(240 ÷ cut) pieces — whole pieces only, and the remainder is scrap.

Cut lengthPieces per 20 ft stickOffcut
16 in150 in
20 in120 in
24 in100 in
30 in80 in
37 in618 in
48 in50 in

Swipe the table sideways for more columns →

Cuts that divide 240 evenly waste nothing; 37 in leaves 18 in per stick. That is the same takeoff logic as any other bar — the offcut is a remainder, not a percentage — and the estimator page works it on a full job.

Cut lengths from 16 to 48 inches yield 15 down to 5 pieces from one 20 foot stick of rebar One 20 ft stick: how many dowels each cut length yields 240 in of bar per stick · whole pieces only · offcut is the remainder 0 4 8 12 16 16 in cut 15 pieces 240 ÷ 16 20 in cut 12 pieces 240 ÷ 20 24 in cut 10 pieces 240 ÷ 24 30 in cut 8 pieces 240 ÷ 30 37 in cut 6 pieces 240 ÷ 37 · 18 in offcut 48 in cut 5 pieces 240 ÷ 48 A cut that divides 240 in evenly wastes nothing; 37 in yields 6 pieces and an 18 in remainder.
One 20 ft stick at six cut lengths. The count is whole pieces; the remainder is scrap you still pay for.

Smooth dowels vs deformed rebar

“Dowel” covers two different products, and mixing them up is a real failure mode:

Put a deformed rebar dowel into a pavement joint and you have built a tie bar by accident: the joint cannot move, so the movement shows up as a random crack somewhere else. If the drawing says “dowel” near a joint that is meant to open, check whether it wants smooth. The driveway spacing page covers where those joints go; the dowel inside them is a different bar.

Coated dowels and the embedment penalty

Epoxy coating protects the bar, but it also reduces bond, so the embedment has to grow. The coating factor is 1.2 when cover is at least 3db and clear spacing at least 6db, and 1.5 otherwise — the same ψe the development length formula uses:

Barld uncoatedld epoxy (1.2)ld epoxy (1.5)
#416 in19 in23 in
#519 in23 in29 in
#623 in28 in35 in

Swipe the table sideways for more columns →

So an epoxy-coated #4 dowel in a tight detail is a 23 in embedment, and with the 21 in lap that is a 44 in cut — not the 37 in of the uncoated detail. The coating does not change the lap rule; it changes the length the lap is computed from.

Plan view of a coated dowel crossing a joint: the joint face is the only place chloride reaches the bar joint face — the only place chloride reaches the bar coated bar anchored half — embedment free half — sleeve or pocket The coating protects the joint face, not the bond: embedment still grows 20% to 50%.
Where a coated dowel earns its place: at the gap, where the bar has no cover. The bond penalty applies on the anchored side, and it is the same 1.2 or 1.5 factor in the table above. Why the two products are not interchangeable is set out on the epoxy for rebar dowels page.

Dowel rebar into existing concrete: 1/8 in over the bar, 1/2 in past the depth

Everything above is the cast-in case, where the concrete is poured around the bar. Drilling rebar into existing concrete changes one thing only: the buried end develops through an adhesive ring instead of through cast-in bond. The arithmetic that follows from it is fixed and small — the bit is 1/8 in larger than the bar, the hole is 1/2 in deeper than the bonded length, the adhesive is the annulus times the depth, and the count is still floor(clear ÷ spacing) + 1.

How to install dowel bars into a cured pour, in the order that decides the result: mark, drill, clean, inject, insert. Adhesive that goes into a dusty hole is wasted adhesive, and a bar twisted into a gelled cartridge never comes back out. Four tools do the whole job — a hammer drill, a nylon brush, a blow-out pump and the cartridge gun. Keep a wrap of tape on the bit at the drilled depth: a hole that is 15 in instead of 16.5 in has 9 percent less bonded area and nothing about it looks wrong from the surface.

Hole size: the bit is the bar plus 1/8 in

That gap is not clearance for the bar to slide into — it is the annulus the adhesive has to fill, and it is the number every cartridge table is written around. Tighter and the bar scrapes the adhesive off the hole wall on the way in; wider and you spend adhesive filling a gap that carries no load.

BarBar dia (in)Drill bitBonded length (in)Drill to (in)
#30.3751/21212.5
#40.5005/81616.5
#50.6253/41919.5
#60.7507/82323.5
#70.87513434.5
#81.0001-1/83838.5
Swipe the table sideways to see every column.

Bonded length is the ACI 318-19 §25.4.2.2 simplified development length used in the embedment section above — Grade 60 bar, 4,000 psi normalweight concrete, uncoated. A different grade, strength or coating moves the bonded length; the 1/8 in and 1/2 in rules do not move.

16.5 indrilled16 inbonded1/8 in of adhesive all round#4 bar in a 5/8 in hole · 16 in bonded + 1/2 in spare at the bottom
One #4 dowel hole: 5/8 in bit, 16.5 in drilled, 16 in bonded. The blue ring is the only thing transferring load into the existing concrete.

Two details matter more than they look. The hole floor does not need to be flat, but it must not be cone-shaped from a worn bit, because a cone leaves the bottom of the bar sitting in air. And the hole must be blown out before it is measured: a 16.5 in hole holding an inch of dust is a 15.5 in hole.

Adhesive per hole, and how far a cartridge goes

Volume is the annulus between hole wall and bar, times the drilled depth. It is worth doing once per bar size, because the result is not intuitive: a #4 hole is small but there are a lot of them, and the count falls fast as the bar grows — the annulus climbs with the square of the diameter while the cartridge does not.

BarAdhesive per hole (in³)Holes per 10 ozHoles per 20 ozHoles per 600 ml
#31.0716.833.634.1
#41.829.919.820.1
#52.636.913.713.9
#63.754.89.69.8
#76.352.85.75.8
#88.032.24.54.6
Swipe the table sideways to see every column.

1 US fl oz = 1.8047 in³; 600 ml = 36.6 in³. These are geometric volumes with no waste allowance — add about 10 percent on site for the adhesive that stays in the mixer nozzle and on the floor.

joint20 ft = 240 in, 16 in on centre
countfloor(240 ÷ 16) + 1 = 16 dowels
holes16 × 16.5 in deep, 5/8 in bit
adhesive16 × 1.82 = 29.2 in³ → two 10 oz cartridges, or one 600 ml
bar37 in each, from the cut length section

Scale it once to see where the money goes: a 100-hole #4 job is 182 in³, about ten 10 oz cartridges. The same 100 holes in #6 is 375 in³, about twenty-one.

Cleaning is the step that decides capacity

Concrete dust is fine, it coats the wall of the hole, and adhesive bonds to dust instead of to concrete. That is the failure nobody sees: the bar looks set, the adhesive looks solid, and the dowel comes out at a fraction of its rated capacity. Every adhesive system's evaluation report spends more words on cleaning than on mixing, for that reason.

The sequence that works is short: nylon brush sized to the hole, in and out with a twist, blow from the bottom with oil-free air, then brush and blow again. Two rounds, not one. If the hole will sit overnight, cap it. What does not work: rinsing with water, blowing with a compressor that carries oil, or trusting the drill's own spiral to clear the hole — each leaves a film on the wall, and the film is what the adhesive grabs.

The rebar dowel drill bit, and what to do when you hit steel

The bit has to match the anchor, not the drill you happen to own: a carbide-tipped masonry bit in the nominal size from the table — 5/8 in for #4 — run in a hammer drill, not a rotary-only drill and not a wood bit. The hole does not need to be pretty; it needs to be round, full depth and the right diameter.

Two substitutions are common and both cost capacity. A diamond core bit cuts a cleaner hole but leaves a smoother wall, and the adhesive tables are written around the rougher hammer-drilled surface; if you core, the bonded length becomes a question for the system's evaluation report, not for this page. And an SDS bit that has drilled a hundred holes is no longer 5/8 in — worn bits drill undersize, which is the one direction you cannot fix afterwards.

Hitting steel is the other half of the bit question. A hammer drill that stops cutting and starts ringing has found existing reinforcement. Stop, back out, and shift the hole along the joint; do not cut the bar and do not drill past it. A hole that is half in concrete and half in steel has no adhesive ring on the steel side, and that side carries nothing.

Horizontal and overhead holes add one more rule: a thixotropic, non-sag adhesive, injected from the back of the hole with a nozzle long enough to reach it, and a stop collar or tape wrap on the bar to hold it at the bonded depth while it sets. A sagging adhesive leaves the top of the hole empty, which is the side that carries the tension.

Worked example: a 20 ft wall on a footing

A 20 ft wall on a footing, #4 dowels at 16 in on centre, Grade 60 bar in 4,000 psi concrete, uncoated, Class B lap into the wall:

embedment = 16 in (ld for #4 at 4,000 psi) projection = 21 in (Class B lap, 1.3 × 16 = 20.8, round up) cut length = 16 + 21 = 37 in count = floor(240 ÷ 16) + 1 = 16 dowels bar needed = 16 × 37 = 592 in = 49.33 ft sticks = 6 per stick -> 16 ÷ 6 = 2.67 -> 3 sticks of 20 ft order = 60 ft = 40.08 lb of #4, 18 pieces, 2 left over

Three sticks deliver 18 pieces for 16 dowels, so the offcut is two 37 in pieces — the same remainder arithmetic as the cut-length table. At 12 in on centre the wall takes 21 dowels, which is 3.5 sticks → 4 sticks, and the same 37 in cut.

What changes the answer. A different bar size changes the embedment (and with it the cut). A different concrete strength changes ld — higher strength shortens it, lower strength lengthens it. Epoxy adds 20% to 50%. A drawing that calls a shorter projection means the joint is not a lap, and that detail needs the engineer’s intent, not arithmetic. The development length page carries the full ld table for #3 to #11 and the cover factor.

Watch: 16 in + 21 in, in one screen

16-second walkthrough: embedment 16 in and Class B projection 21 in make a 37 in cut; a 20 ft stick yields six of them with 18 in left over, and a 20 ft wall at 16 in on centre needs 16 dowels — floor(240 ÷ 16) + 1. From the rebarcount channel.

Common questions

What is a rebar dowel?

A short bar cast into one pour and left standing for the next. The buried end develops in the first pour, the exposed end laps into the second, and together they carry the load across the construction joint. It is not a lap splice (both ends of a lap are bonded into the same pour) and not an anchor (an anchor holds a load in one pour).

How deep should a rebar dowel be embedded?

At least the development length. For Grade 60 bar in 4,000 psi concrete the simplified ACI 318-19 values are 16 in for #4, 19 in for #5, 23 in for #6 and 38 in for #8, with 12 in as the code minimum for any bar. Epoxy coating raises those by 20% to 50%. The embedded end has to reach yield before the joint can slip, so a dowel set 6 in into a footing is not a dowel — it is a pin.

How long should a rebar dowel be?

Cut length = embedment + projection. For a #4 dowel in 4,000 psi concrete with a Class B lap into the wall, that is 16 in + 21 in = 37 in. The projection is not a guess: if it laps the next pour’s bars it must be a lap length, and Class B (1.3 × ld) is the default when nobody has checked the splice class.

What size rebar should a dowel be?

Whatever the drawing calls for, and it has to match the bars it laps with. A #4 dowel laps #4 wall bars; matching sizes keeps the lap a lap. The size then sets the embedment through the development length — #4 needs 16 in, #6 needs 23 in at 4,000 psi — so the smaller bar is not automatically the cheaper detail once you count the cut length.

How many dowels do I need per foot?

One divided by the spacing in feet: at 12 in on centre it is 1.00 per foot, at 16 in it is 0.75, at 18 in 0.67 and at 24 in 0.50. Count a joint the same way a mat is counted — floor(clear length ÷ spacing) + 1 — so a 20 ft wall at 16 in o.c. takes 16 dowels, not 15.

Can I use rebar as a dowel in a driveway joint?

Not as a pavement dowel. Contraction and expansion joints need smooth dowel bars, usually with one end coated or sleeved as a bond breaker, so the joint can open and close. A deformed rebar dowel bonds to both slabs, locks the joint, and the crack appears somewhere else. Deformed rebar dowels belong in structural joints — footing to wall, slab to wall — where the two pours are meant to act as one.

Do rebar dowels need to be epoxy coated?

Only where the detail calls for corrosion protection — exterior walls, marine or deicing exposure, thin cover. Coating is not free structurally: the epoxy factor is 1.2 when cover and spacing are generous and 1.5 otherwise, so a #4 dowel’s embedment goes from 16 in to 19 in or 23 in. Coating changes the embedment, not the cut length logic.

How many dowels come from one 20 ft stick?

One 20 ft stick is 240 in, and the count is floor(240 ÷ cut length). At a 37 in cut that is 6 dowels with 18 in left over; at 20 in it is 12 with nothing left; at 30 in it is 8. The remainder is why dowel orders are counted in whole sticks — the offcut is not a percentage.

What size hole do I drill for #4 rebar?

5/8 in. The rule is 1/8 in over the bar: #4 is 1/2 in, so the bit is 5/8 in. #3 goes in 1/2 in, #5 in 3/4 in, #6 in 7/8 in, #7 in 1 in and #8 in 1-1/8 in. The gap is the adhesive, so it is not clearance you can spend.

How deep should I drill for a rebar dowel?

The bonded length plus 1/2 in. For #4 Grade 60 in 4,000 psi concrete the bonded length is 16 in, so the hole is 16.5 in. The spare half inch stops the bar bottoming out on dust or a rough hole floor, which would leave it short of the depth you designed.

How many holes will one 10 oz cartridge fill?

Nine #4 holes. A 5/8 in hole around a 1/2 in bar leaves 0.110 in² of adhesive, times 16.5 in of depth is 1.82 in³ per hole, and a 10 oz cartridge is 18.05 in³. #3 gives about 17 holes, #5 about 7, #6 about 5, #8 about 2.

Open the Rebar Calculator → Free, no login, runs in your browser

Published 17 October 2026 · Last reviewed 17 October 2026

Dimensions and code references: ACI 318-19 §25.4.2.2 (simplified development length), §25.4.2.1 (12 in minimum), §25.5.2 (Class A and Class B lap splices); nominal bar weights from ASTM A615 Table 1. The ld values are the same simplified table carried on the rebar development length page. This page quotes dimensions, not prices.