All calculations run in your browser. Your inputs are never sent to any server.

Rebar vs Wire Mesh

Two products, two sets of numbers — and why one is not a lighter version of the other

← Back to the calculator
Wire mesh is not a lighter rebar mat — it is a different product in different units.A 6×6-W1.4 sheet puts 19.1 lb of steel in 100 sq ft; #4 bar at 12 in on centre puts 133.6 lb, 7.0× more.

On a 20 × 40 ft driveway the gap is 916.3 lb, 0.46 ton. Mesh controls cracks in a non-structural slab; bar carries load where the drawing says structural.

The trap is the word “mat”. A mesh mat and a bar mat look like the same idea on a section drawing, but they are counted differently, ordered differently and lapped differently. Read the steel per square foot and the decision makes itself.

19.1 lbmesh, per 100 ft²
133.6 lb#4 @ 12 in, same area
7.0×steel ratio
916 lb20×40 ft gap

Two products, two sets of numbers

Rebar is a deformed round bar sold in 20 ft lengths, counted bar by bar, lapped bar to bar, and cut from stock with an offcut. Welded wire mesh is cold-drawn wire welded into a grid, sold in sheets or rolls, counted by coverage, and overlapped one wire space at the edges. Nothing about the second is a scaled-down version of the first.

That difference shows up in every number on the order. A bar takeoff ends in pieces, feet and pounds. A mesh takeoff ends in sheets, rolls and square feet. The two do not convert without knowing the steel area of the mesh, which is what the W number gives you.

Welded wire meshRebar
ProductWelded wire grid, ASTM A1064Deformed bar, ASTM A615
Sold asSheets (5 × 10, 8 × 20 ft) or rolls (150 ft)20 ft or 40 ft sticks
Counted byCoverage, sheets and lapsBars, feet, pounds
LapOne wire space + 2 in, min 6 inClass A or B splice, 1.0 or 1.3 × development length
OffcutEdge trim only0 to 40% on 20 ft stock
PlacementFloppy, must be lifted and tiedHeld at depth by chairs

Swipe the table sideways for more columns →

This is why “swap the mesh for rebar” is not a sentence an estimator can act on without a number. The swap changes the unit, the lap and the placement, not just the price.

Steel per 100 sq ft: 19.1 vs 133.6

Put both on the same basis and the gap is easy to see. A 100 sq ft area with bars at 12 in on centre both ways holds about 200 ft of bar: 10 ft runs, ten of them each direction. Multiply by the weight per foot and the number falls out.

#4 @ 12 in200 ft of bar × 0.668 lb/ft = 133.6 lb / 100 ft²
6×6-W1.4400 ft of wire × 12 in × 0.014 in² × 0.2836 = 19.1 lb / 100 ft²
ratio133.6 ÷ 19.1 = 7.0×
ReinforcementSteel per ft, per directionlb per 100 ft²vs 6×6-W1.4
6×6-W1.4 mesh0.028 in²19.11.0×
6×6-W2.9 mesh0.058 in²39.52.1×
6×6-W4.0 mesh0.080 in²54.52.9×
#3 bar @ 12 in0.110 in²75.23.9×
#4 bar @ 12 in0.200 in²133.67.0×
#5 bar @ 12 in0.310 in²208.610.9×

Swipe the table sideways for more columns →

Steel 0.2836 lb/in³. Bar area from nominal diameter; mesh area from the W number × 100 (W1.4 = 0.014 in²), two wires per foot at 6 in spacing. The bar rows assume both directions; a one-way mat halves them.

Steel in 100 sq ft: mesh is not a light bar mat lb of steel per 100 sq ft, bars at 12 in on centre both ways 6×6-W1.4 mesh 19.1 6×6-W2.9 mesh 39.5 6×6-W4.0 mesh 54.5 #3 bar @ 12 in 75.2 #4 bar @ 12 in 133.6  —  7.0× the W1.4 sheet #5 bar @ 12 in 208.6 Grey = welded wire mesh sheet, blue = rebar mat. Mesh areas from the W number (W1.4 = 0.014 in² per wire); bar areas from nominal diameter.
The same 100 sq ft, six ways: the heaviest common mesh sheet (W4.0, 54.5 lb) still lands below a #3 bar mat (75.2 lb), and the everyday 6×6-W1.4 sheet is 7.0 times lighter than #4 at 12 in on centre. Stacking mesh layers is the only way to climb that ladder without switching products — and that is a design decision, not a substitution.

Read the table down the “vs” column and the real point appears: the heaviest common sheet, W4.0, is still less than a #3 bar mat. There is no sheet size that turns into a #4 mat without stacking layers, and stacking layers is a design decision, not a substitution.

What each one does in the slab

Mesh is temperature and shrinkage reinforcement. Its job is to hold a crack closed after the concrete shrinks, so the crack stays hairline instead of opening. That is crack control, and it is a real job — a patio or a shed floor with no steel will crack, and the crack will widen.

Bar is structural reinforcement where the drawing says so: it carries bending and shear that the concrete alone cannot, and it also does the crack-control job because it is steel in the slab. A driveway, a structural slab, a suspended slab — those are bar jobs because the slab is carrying loads, not just holding itself together.

SlabUsual answerWhy
Patio, walkway, shed floor6×6-W1.4 mesh, or #3 @ 18 inCrack control only, foot traffic
Driveway, car or truck#4 @ 18 in, or #4 @ 12 in heavyWheel loads, structural
Structural slab on gradePer drawing, usually #4 or #5Designed flexural steel
Garage floor, basement#4 @ 12–18 inCrack control plus point loads

Swipe the table sideways for more columns →

The mistake that costs money is using mesh where the drawing wanted bar. The slab does not fail the day it is poured; it cracks, deflects and spalls over a season, and by then the mesh is buried and the repair is a replacement.

When mesh is the right answer

Mesh wins where the only job is crack control and the slab is not carrying designed loads:

Mesh also wins on speed and handling: a sheet covers 50 sq ft in one lift, and there is no cutting and tying of individual bars. On a small residential pour that is the difference between an afternoon and a day.

What mesh does not win is anything the engineer sized. If the drawing has a bar schedule, the schedule is the answer, and a sheet of mesh laid under it is not a substitute for the bars in it.

When bar is the right answer

Bar wins wherever the slab is doing structural work, and wherever the steel has to be at a set depth:

The depth point is the one people miss. A mat at the bottom of a slab does almost nothing for surface cracks, because the cracks start at the top. Bar on chairs sits in the upper third where the steel can act; mesh, unless it is carefully lifted and tied, does not stay there.

If you are working out a bar mat, the count is on the spacing calculator and the tonnage is on the weight calculator. If you are pricing the two, the difference is the 7× on this page before labour.

Ordering: sheets and rolls vs 20 ft sticks

The order is where the two products stop looking similar at all. Bar is ordered in sticks and the run length decides the offcut; mesh is ordered in sheets or rolls and the coverage decides the sheet count.

BarMesh
Unit20 ft or 40 ft stickSheet (5 × 10, 8 × 20 ft) or roll (150 ft)
LapClass A 1.0 × ld, Class B 1.3 × ldOne wire space + 2 in, min 6 in (8 in at 6 in)
Waste0–40% depending on how runs divideEdge trim only
Count byBars per direction, then sticksSheets by coverage, plus lap

Swipe the table sideways for more columns →

A 20 × 40 ft slab is 800 sq ft. In 5 × 10 ft sheets that is 16 sheets before lap; with an 8 in lap on a 40 ft run you lose about 7% to overlap, so 17 sheets. In bar it is the count on the slab page, then the stick count, then the offcut. Two different arithmetic, two different orders.

Reading the W number

A mesh designation has two parts: spacing × spacing, then W number × W number. The W number is the cross-sectional area of one wire in square inches, multiplied by 100.

6×6wire spacing 6 in both directions
W1.4wire area 0.014 in²
6×6-W1.4×W1.4same wire in both directions
DesignationWire areaSteel per 100 ft²Typical use
6×6-W1.4×W1.40.014 in²19.1 lbResidential slabs, patios
6×6-W2.9×W2.90.029 in²39.5 lbLight structural, driveways
4×4-W4.0×W4.00.040 in²54.5 lbHeavier slabs, industrial

Swipe the table sideways for more columns →

Two names to keep straight: WWF (welded wire fabric) is the older term and WWR (welded wire reinforcement) is the current one. They are the same product, and ASTM A1064 is the specification. A drawing that says “6×6-W1.4 WWF” and one that says “6×6-W1.4 WWR” are asking for the same sheet.

The failure nobody plans: mesh on the subgrade

Ask anyone who has pulled up a failed patio and they will tell you where the mesh was: on the ground, under the slab, doing nothing. Mesh has almost no stiffness, so it goes down when it is walked on during placement, and a mat at the bottom cannot control a crack that starts at the top.

Bar does not have this failure mode because chairs hold it at a set height. That is a placement advantage, and it is worth more than the 7× steel difference on a small slab — a light mat at the right depth beats a heavy mat at the bottom.

If you use mesh, the detail is: pull it up as you place, hook it over the form or the chairs, and check it before the screed goes across. If the drawing calls for mesh at mid-depth or in the upper third, that is a placement instruction, not a suggestion.

Worked numbers: 10 × 10 and 20 × 40

Two areas, both at 12 in on centre for the bar, so the comparison is the same product choice at two scales.

10 × 10 ft100 ft² — mesh 19.1 lb, #4 bar 133.6 lb, difference 114.5 lb
20 × 40 ft800 ft² — mesh 152.5 lb, #4 bar 1,068.8 lb, difference 916.3 lb = 0.46 ton
Area6×6-W1.4 mesh#4 @ 12 in both waysDifference
10 × 10 ft (100 ft²)19.1 lb133.6 lb114.5 lb
20 × 40 ft (800 ft²)152.5 lb1,068.8 lb916.3 lb

Swipe the table sideways for more columns →

Mesh = 19.1 lb per 100 ft² × area. Bar = 133.6 lb per 100 ft² × area, from 0.668 lb/ft × 200 ft of bar per 100 ft². 916.3 lb ÷ 2,000 = 0.458 ton, rounded to 0.46.

That is the number to carry into a quote. At a material price per pound the difference is real money, and it is the reason a builder reaches for mesh on a patio and bar on a driveway — not habit, arithmetic.

Watch: 19.1 vs 133.6 lb, in one screen

16-second walkthrough: 6×6-W1.4 mesh puts 19.1 lb of steel in 100 sq ft and #4 bar at 12 in on centre puts 133.6 lb — 7.0× more. On a 20 × 40 ft driveway that is 152.5 lb against 1,068.8 lb, a gap of 916.3 lb (0.46 ton). From the rebarcount channel.

Common questions

Is wire mesh as strong as rebar?

No, at the sizes people compare. A 6x6-W1.4 sheet puts 19.1 lb of steel in 100 sq ft and #4 bar at 12 in on centre puts 133.6 lb, so the bar mat has about seven times the steel. Strength is not the only measure - mesh is doing crack control, bar is doing structural reinforcement - but the two are not interchangeable by area of steel.

Can I use wire mesh instead of rebar in a driveway?

On a light-duty driveway that only sees foot traffic or a garden cart, mesh is a common crack-control choice. On a driveway that takes cars, trucks or a camper, the usual answer is deformed bar at the spacing on the drawing, because the slab is carrying wheel loads. If a drawing specifies bar, the drawing wins.

What does 6x6-W1.4 mean?

6x6 is the wire spacing in inches both ways. W1.4 is the wire size: a W number is the cross-sectional area of the wire in square inches multiplied by 100, so W1.4 is 0.014 sq in. The full designation 6x6-W1.4xW1.4 says the same wire runs in both directions.

How much steel is in wire mesh?

A 6x6-W1.4xW1.4 sheet carries about 0.028 sq in of steel per foot in each direction, which is 19.1 lb per 100 sq ft. Heavier sheets go up from there: 6x6-W2.9 is about 39.5 lb per 100 sq ft and 6x6-W4.0 is about 54.5 lb.

How much steel is in a 20 x 40 ft driveway at #4 bar versus mesh?

At #4 bar, 12 in on centre both ways, 800 sq ft takes 1,068.8 lb. At 6x6-W1.4 mesh it takes 152.5 lb. The difference is 916.3 lb, or 0.46 ton - and that is the whole reason the two are not a swap.

Do I need rebar on top of wire mesh?

No. One or the other, as the drawing says. Putting mesh under a bar mat does not make the slab stronger in any way an engineer counts; it adds a second layer that can end up at the wrong depth. If the drawing calls for both, that is a specific detail, not a default.

How do you lap wire mesh?

One wire space plus 2 in, and never less than 6 in. At 6 in spacing that is an 8 in lap. Mesh laps are shorter than bar laps because the wire is small and continuous, but the lap still has to be wired or tied so the sheets do not separate while the concrete is placed.

Why does wire mesh end up on the subgrade?

Because it is floppy. A sheet of mesh has almost no stiffness, so when it is walked on during placement it goes down, and a mat at the bottom of the slab does nothing for cracks that start at the surface. Bar on chairs holds its depth, and that placement is a bigger difference than the weight of steel.

Is welded wire mesh the same as rebar?

No. Rebar is a deformed round bar sold in 20 ft lengths and lapped bar to bar. Welded wire mesh is cold-drawn wire welded into a grid and sold in sheets or rolls, with no 20 ft stock length and no offcut in the same sense. The only thing they share is that both are steel in concrete.

What is the difference between WWF and WWR?

Nothing physical. Welded wire fabric (WWF) is the older name; welded wire reinforcement (WWR) is the current one, and both refer to the same welded grid. ASTM A1064 is the specification that covers the wire.

Open the rebar calculator Free, no login, runs in your browser

Published 19 October 2026 · Last reviewed 19 October 2026

Figures: bar weight 0.668 lb/ft for #4, steel 0.2836 lb/in³; mesh steel from the W number (area in² × 100) at 6 in spacing, two wires per foot; laps per ASTM A1064 practice (one wire space + 2 in, min 6 in) and ACI 318-19 25.4.2.1 for bar. This page quotes quantities, not prices.